![]() ![]() Pavement markings (usually arrows) are also essential in directing the flow of one-way traffic throughout your parking lot. A clearly striped crosswalk will be hard to miss, thereby minimizing the chance of collisions. Proper parking lot striping helps safely guide both drivers and pedestrians. Parking lot striping is just one of the expert-level services we offer at Lone Star Paving, and we’re happy to tell you just how it can benefit you. If left neglected, a parking lot can become an unsightly mess that leaves a bad impression on visitors. From simple garden designs to complex stone work, living spaces and more, Lonestar Landscaping can help you transform your current outdoor living space or yard into a one-of-a-kind vision of beauty.Īt Lonestar Landscaping, we take great pride in every job we do, knowing that our design, craftsmanship and execution will be above and beyond our customers’ expectations.In the day-to-day hustle of running your business, the state of your parking lot might be something you rarely consider. Working as a team, we integrate your ideas with our experience and professional knowledge. With an emphasis on fine detail, lasting strength, and beauty, Lonestar Landscaping will increase the appeal and functionality of your property, providing you with greater enjoyment, use of space, and an increase in property value.This Quarterly Road Report includes street projects currently under construction or in the design phase in the City of Mansfield. Bart VanAmburgh, Director of Public Works, 81, David Boski, Assistant Director of Public Works-Transportation, 81, Raymond Coffman, City Engineer, 81, Projects Under Construction Mansfield International Business Park (Klein Boulevard and South Seventh Avenue).The Mansfield Economic Development Corporation owns land near Easy Drive and South Second Ave. This project will construct Klein Boulevard, a four-lane, divided roadway from FM 917 west across South Second Avenue and through the MEDC property. It also includes constructing South Seventh Avenue, a three-lane, undivided roadway along the western boundary north to Easy Drive. Both projects include water, sanitary sewer and storm drain improvements. Also, due to poor pavement condition and anticipated increased traffic volumes, this project includes asphalt improvements to South Second Avenue from the proposed Klein Boulevard south to FM 917. The utilities and paving improvements are substantially complete. ![]() South Holland Road (Stonebriar Trail to Garden Path Lane) - Street Bond Fund The project is expected to be complete this spring. Holland Road will be improved to a four-lane, divided thoroughfare. The project will include finishing the north side of National Parkway west of Holland Road. A traffic signal at Holland Road and National Parkway is also be included. This project requires a large segment of detour pavement to accommodate project construction. Franchise utility companies have significant overhead infrastructure that must be relocated prior to start of the project. These utility relocations are in progress. The project has been publicly bid and construction is expected to begin this month. Price Road (East Dallas Street to South Main Street) – Street Bond Fund The estimated construction time is 14 months. Price Road will be reconstructed to a 26-foot wide asphalt roadway. ![]() The project will include bar ditch and driveway culvert enhancements to improve drainage capacity where feasible. The design will also include the realignment of Price Road at the intersection of East Dallas Street, providing a safer intersection closer to 90 degrees than the existing intersection. This project was bid on March 24 and construction is expected to begin in May. Heritage Parkway Westbound Lanes (Commerce Drive to South Main Street) – Street Bond Fund The estimated construction time is five months. The two westbound lanes of Heritage Parkway will be reconstructed due to current pavement conditions. A sidewalk will be included on the north side of the roadway. The project was publicly bid on March 18 and construction is expected to begin in May. The estimated construction time is eight months. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |